The most important completed projects
The installation of 4 elevators with a load of 5,000 kg was completed for the new Ministry of Energy building
An elevator was supplied and installed at Kuwait International Airport for 4 parking lots with special specifications, and this project was completed
Two buildings of 11 floors have been completed, owned by Kuwait Finance House, at a speed of 1.6 m / s
The aforementioned project was completed for 38 electric elevators for residential complexes
The supply and installation of two bed elevators for Al Manakh Commercial Complex have been completed
Supply and installation of an electric walkway - three thousand kilo lifts
Supply, installation and maintenance of a hydraulic elevator at Al-Watan TV building. Supplying and installing a number of electric elevators for the Al-Watan newspaper building
Supplying, installing and maintaining an elevator for the school building
Construction, completion and maintenance project of 5 elevators (8) parking lots of Al-Anoud Commercial Complex
Project completion and maintenance of a number of elevators in the Naval Club
Project completion, completion and maintenance of Al-Jahra Sports Club elevator
Completion, installation and maintenance of 16 elevators of the Mahboula residential complex
Supplying 5 elevators in the private institutes around me, pledged by Ali Alghanim and Sons
Care Homes Project Supplying two elevators with a load of 1275 kg
Installing 8 elevators (Khaitan - Farwaniya)
Installing 8 elevators in Al Maqaf
Radical maintenance of the elevators of the Sabah Al-Salem residential complex
Completion, installation and maintenance of 7 elevators with a load of 1000 kg from 2009-2010
Installation and maintenance of 4 elevators in the Holy Quran Memorization House, Bam Al Hayman and Mahboula
Supply and installation of 1 elevator for the administration building
Supply and installation of 3 elevators for schools in the Naseem area
Supply and installation of 16 lifts, and 2 elevators 10 floors
Achievement and maintenance of more than 80 elevators in different regions in Kuwait
Installing about 50 elevators in different parts of the State of Kuwait
An order to commission the operation of 109 elevators in Sabah Al-Salem in 2010
Supplying and installing 2 electric walkways, 2 elevators 1250 kg + elevator 1600 km
Supplying and installing 1 elevator for the main building
Supply and installation of 6 elevators and 4 electric walkways for the Granada Association
Supply and installation of 1 administration building
Supplying and installing 4 electric walkways (the largest in the Middle East and North Africa)
Supplying and installing 2 elevators in the Officers Club
Supply and installation of 2 service elevators
Supply and installation of 6 elevators in the Authority’s colleges
Supply and installation of a VIP elevator
Supply and installation of 2 vip elevators
Supply and installation of 3 elevators + 1 cargo elevator for Abdul Hussein Abdul Redha theater